Two design choices drive long-term value as much as the upfront install. Load balancing shares supply intelligently across chargers, EVs and the building, preventing site trips and avoiding expensive grid capacity upgrades. OCPP compliance keeps you free to choose any management platform over the next decade, instead of being locked into one vendor's software and tariffs.
Beyond the design choices, install cost itself depends on several factors. AC versus DC, the kW rating per socket, the number of sockets, your grid capacity, and the civil works needed to route cabling all shift the bracket. An AC workplace install (7-22kW) sits in a very different place to a DC rapid charger (50kW+) at a forecourt or fleet depot.